如何混凝土攪拌機(jī)運行緩慢的問題
如何混凝土攪拌機(jī)運行緩慢的問題,分析了混凝土攪拌機(jī)軸停止轉(zhuǎn)動或轉(zhuǎn)動緩慢的原因?,F(xiàn)在我們已經(jīng)發(fā)現(xiàn)了問題和如何它,讓我們一起來看看混凝土攪拌機(jī)慢速運行的方案:
How to solve the problem of slow operation of concrete mixer, and analyze the reason why the shaft of concrete mixer stops rotating or rotates slowly. Now that we've discovered the problem and how to solve it, let's look at the solution of concrete mixer running slowly:
如何混凝土攪拌機(jī)運行緩慢的問題
How to solve the problem of slow operation of concrete mixer
分析了混凝土攪拌軸停止轉(zhuǎn)動或轉(zhuǎn)動緩慢的原因。既然我們已經(jīng)發(fā)現(xiàn)了問題和如何它,讓我們看看運行緩慢的混凝土攪拌機(jī)。
The reason why the concrete mixing shaft stops rotating or rotates slowly is analyzed. Now that we have identified the problem and how to solve it, let's look at the slow-moving concrete mixer.
1.混凝土攪拌站因懸掛攪拌軸而造成超載,只需調(diào)整攪拌軸的料量,卸下多余的料量,降低攪拌軸的轉(zhuǎn)動負(fù)荷。
1. The concrete mixing station is overloaded due to the suspension of the mixing shaft. Only adjust the material quantity of the mixing shaft, unload the excess material quantity and reduce the rotating load of the mixing shaft.
2.當(dāng)側(cè)葉片卡在攪拌軸內(nèi)壁時,在攪拌軸停止前經(jīng)常會有尖銳刺耳的摩擦聲。此時應(yīng)立即停機(jī)檢查,手動異物,重新調(diào)整混凝土攪拌站攪拌葉片或側(cè)葉片與罐體內(nèi)壁之間的間隙。
2. When the side blade is stuck on the inner wall of the mixing shaft, there is often a sharp and harsh friction sound before the mixing shaft stops. At this time, the machine shall be stopped immediately for inspection, foreign matters shall be removed manually, and the gap between the mixing blade or side blade of the concrete mixing plant and the inner wall of the tank body shall be readjusted.
3.混凝土攪拌站電機(jī)驅(qū)動皮帶過松,只需調(diào)整砼攪拌站電機(jī)驅(qū)動皮帶的張力后停止。
3. The motor drive belt of the concrete mixing station is too loose. Only adjust the tension of the motor drive belt of the concrete mixing station and then stop.
以上是中科聚峰廠家為大家介紹的相關(guān)內(nèi)容,想要了解更多內(nèi)容,歡迎訪問網(wǎng)站:http://jbckj.cn
The above is the relevant content introduced by Zhongke Jufeng factory. To learn more, please visit the website: http://jbckj.cn