中科混凝土攪拌機(jī)的規(guī)范操作你了解嗎?
如何規(guī)范中科混凝土攪拌機(jī)的操作?混凝土攪拌機(jī)的準(zhǔn)備
How to standardize the operation of concrete mixers in Zhongke? Preparation of concrete mixers
1.檢查攪拌機(jī)是否穩(wěn)定,四個(gè)支撐腿是否牢固;
1. Check whether the mixer is stable and whether the four support legs are firm;
2.機(jī)器運(yùn)轉(zhuǎn)是否正常;
2. Whether the machine operates normally;
3.水泵注分流水,試車一次;
3. The water pump shall be injected with separate water and tested once;
4.檢查電器的接地。
4. Check the grounding of electrical appliances.
二、混凝土攪拌機(jī)的使用要求
2、 Requirements for use of concrete mixer
1.每次添加的混合料不得超過規(guī)定值,料斗必須在混合完成后才能抬起進(jìn)料;
1. The mixture added each time shall not exceed the specified value, and the hopper can only lift the feed after mixing;
2.滾筒反轉(zhuǎn)時(shí)千萬不要提起手柄;
2. Do not lift the handle when the roller reverses;
3.為了減少粘鍋現(xiàn)象,在進(jìn)料斗時(shí),優(yōu)先順序?yàn)樯暗[—水泥—砂或砂—水泥—石;
3. In order to reduce the phenomenon of boiler sticking, the priority of feeding hopper is gravel cement sand or sand cement stone;
4.加料時(shí)及時(shí)加水,縮短攪拌時(shí)間,減少粉塵;
4. Add water in time when feeding, shorten mixing time and reduce dust;
5.當(dāng)料斗升起時(shí),任何人不得在料斗下停留或通過;當(dāng)必須在料斗下進(jìn)行維修時(shí),料斗應(yīng)用鏈固定。
5. When the hopper is raised, no one is allowed to stay or pass under the hopper; when maintenance must be carried out under the hopper, the hopper shall be fixed with safety chain.
6.非操作人員不得翻轉(zhuǎn)控制手柄;機(jī)器不運(yùn)轉(zhuǎn)時(shí),一定要用鉤把機(jī)器固定好;
6. Non operators shall not turn over the control handle; when the machine is not running, it must be fixed with a safety hook;
7.注意電器的,經(jīng)常檢查接地是否良好,防止電機(jī)受潮,防止電器元件、電線的損壞;
7. Pay attention to the safety of electrical appliances, regularly check whether the grounding is good, prevent the motor from getting damp, and prevent the damage of electrical components and wires;
8.斷電時(shí),用曲柄搖撼減速機(jī)帶板,將筒內(nèi)物料排出;
8. When the power is cut off, shake the belt plate of the reducer with the crank to discharge the materials in the barrel;
9.停車時(shí),必須放下四個(gè)支撐腳管來支撐機(jī)器的重量;
9. When parking, four support legs must be put down to support the weight of the machine;
三、混凝土攪拌機(jī)完成工作的要求
3、 Requirements for completion of concrete mixer
1.停機(jī)前,應(yīng)將一定數(shù)量的石子和水放入機(jī)器中,攪拌5 ~ 10分鐘,然后釋放,以氣缸內(nèi)的積存,避免粘在水箱上;
1. Before shutdown, a certain amount of stones and water shall be put into the machine, stirred for 5 to 10 minutes, and then released to eliminate the accumulation in the cylinder and avoid sticking to the water tank;
2.混凝土上的積灰和粘結(jié)劑;
2. Remove the ash and binder on the concrete;
3.將料斗置于運(yùn)輸位置,懸掛鏈;控制手柄用鉤固定;
3. Place the hopper in the transportation position and hang the safety chain; fix the control handle with the safety hook;
4.切斷電源,鎖好電箱;
4. Cut off the power supply and lock the electric box;
5.在冰凍季節(jié),將供水系統(tǒng)的所有積水全部排放;
5. In the freezing season, discharge all the accumulated water in the water supply system;
6.在每個(gè)潤滑點(diǎn)加注必要的潤滑油。
6. Add necessary lubricating oil at each lubricating point.